New grid connection & power supply

We work with investors from the project planning stage: calculating load, choosing the optimal connection, preparing documents and energizing on time for factory start-up.

Overview

For companies new to Du Long Industrial Park, getting the capacity and connection right from the start avoids over-investment in substations and shortens the time to start operations.

Our engineers provide free load assessment based on your equipment list, production plan and expansion roadmap, then guide you through the documents and the connection agreement.

Scope of service

  • Load calculation and voltage level selection
  • Site survey and proposal of the connection point to the park network
  • Connection agreement and technical solution
  • Guidance and review of the power supply application
  • Inspection and acceptance of the customer's electrical works before energization
  • Metering installation and energization

Benefits for your business

  • Right-sized, cost-effective

    Sized to your actual load and expansion plan – no oversized or undersized transformers.

  • Clear documents from day one

    A complete checklist and step-by-step guidance to avoid repeated submissions.

  • Predictable schedule

    The energization timeline is agreed in advance and aligned with construction and commissioning.

  • Support for FDI companies

    A clear process with detailed guidance and smooth communication with foreign investors.

Document checklist

Reference list for companies applying for a new power supply. Exact requirements may vary with the capacity.

Legal documents

  • Power supply / connection application (standard form)
  • Enterprise Registration Certificate (copy)
  • Investment Registration Certificate (for FDI companies)
  • Land or factory lease agreement in Du Long Industrial Park
  • Power of attorney (if the applicant is not the legal representative)

Technical documents

  • List of electrical equipment and expected total load (kW / kVA)
  • Factory master plan with the proposed substation location
  • Power demand schedule: energization date and capacity ramp-up phases
  • Substation and line design documents (if self-invested)
  • Equipment test reports and acceptance records before energization

Contact our hotline or email to receive the forms and the document list that apply to your project.

Energization time

Agreed specifically during the site survey, based on your documents and the progress of your electrical works. We actively keep it as short as possible so your factory can start operating early.

  1. 1

    Submit a supply request

    Send your requirements and documents according to the checklist below.

  2. 2

    Survey and connection agreement

    Site survey; agreement on connection point, voltage level, capacity and technical solution.

  3. 3

    Design and build electrical works

    The customer builds the substation and lines, or hires Du Long Power to design and build them.

  4. 4

    Acceptance and power purchase agreement

    Inspection, acceptance, equipment test results and signing of the power purchase agreement.

  5. 5

    Meter installation and energization

    Remote metering is installed and the supply is energized.

Frequently asked questions

What substation capacity does my factory need?
It depends on total connected load, diversity factor and expansion plans. Send us your equipment list and our engineers will calculate and advise free of charge.
Do we have to invest in our own substation?
Large loads usually have a dedicated substation for a reliable supply, which we can design and build turnkey. For smaller loads, our engineers will advise the most suitable and economical supply option.
How long does it take to get power?
The energization date is agreed during the survey, depending on your documents and the progress of your electrical works. Substation construction time depends on capacity and type.
What additional documents do FDI companies need?
In addition to the usual documents, FDI companies provide a copy of the Investment Registration Certificate. Documents in foreign languages should come with a Vietnamese translation.

Need advice or a quote?

Send a request and our engineers will contact you shortly for a free consultation.

Request a consultation / quote
Call usZalo24/7 outage